Tippecanoe Bridge 107

Tippecanoe County Bridge 107 over Otterbein Ditch was built in 2008.  The bridge is a fifty (50) foot long solid precast prestressed box beam (PCBB) structure with a composite concrete deck on integral end bents.  The project is set in a semiurban area on the edge of the Otterbein Town limits.

Tippecanoe Bridge 107

PILING IN PLACE - BEAM SEATS BEING INSTALLED

PILING IN PLACE - BEAM SEATS BEING INSTALLED

WINGS AND CAPS POURED UP TO SEATS

WINGS AND CAPS POURED UP TO SEATS

SOLID PRECAST PRESTRESSED BEAMS BEING SET

SOLID PRECAST PRESTRESSED BEAMS BEING SET

DECK REINFORCING STEEL IN PLACE

DECK REINFORCING STEEL IN PLACE

DECK POUR COMPLETE

DECK POUR COMPLETE

RAILING STEEL IN PLACE FORMS BEING SET

RAILING STEEL IN PLACE FORMS BEING SET

VIEW OF COMPLETE INTEGRAL END BENT

VIEW OF COMPLETE INTEGRAL END BENT

STORM SEWER INSTALLATION

STORM SEWER INSTALLATION

SIDE DITCHES CUT

SIDE DITCHES CUT

APPROCH SUBGRADE CUT AND READY FOR PAVEMENT

APPROCH SUBGRADE CUT AND READY FOR PAVEMENT

PAVEMENT UP THROUGH INTERMEDIATE COURSE

PAVEMENT UP THROUGH INTERMEDIATE COURSE

SODDING COMPLETED

SODDING COMPLETED

HYDROSEEDING

HYDROSEEDING

FINISHED BRIDGE 107 PROJECT

FINISHED BRIDGE 107 PROJECT